For the relocation of the laboratory, it was moved and installed after dismantling the existing prefabricated optical table and enclosure.
The old optical frame, belv, etc. have been replaced, and electrical wiring for enclosure lighting has been made.
In the case of this movement Installation, we were using a third-party product, not our product, but we installed it without any problems.